Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint

Product Details
Customization: Available
After-sales Service: Factory
Warranty: 50years
Still deciding? Get samples of US$ 95/Piece
Request Sample
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

  • Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint
  • Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint
  • Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint
  • Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint
  • Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint
  • Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint
Find Similar Products

Basic Info.

Model NO.
YY-2112
Material
Plastic
Connection
Welding
Colour
Black
Working Pressure
0.6MPa ~ 2.0MPa
Temperature Range
- 60 ~ 40degree Celsius
Application
Water Supply, Drainage, Sewerage Treatment, Mine a
Transport Package
50PCS/CTN
Specification
DN50-315mm
Trademark
YOONYEE
Origin
China
HS Code
39269090
Production Capacity
100000sets/Year

Product Description

Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint

Product Name Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint
Material PE100, PE80
Color Black
Size DN50-315mm
Working Pressure 0.6MPa ~ 2.0MPa
Executive standard ISO 9001, ISO 4427, GB/T13663, EN 12201
Temperature Range '- 60°C ~ 40 °C
Application Water Supply, Drainage, Sewerage Treatment, Mine And Slurry Pipelines, Irrigation, etc
Guarantee Product Life Up To 50 Years
Package Standard Packing Or Customized
OEM Available
Features Non-toxic, Green Initiaive, Environment Friendly, Corrosion Resistance, Light weight, Easy To Transport And Install, Lower Maintance Costs.
Connect Socket Fusion, Butt Fusion Joint, Flanged Joint
Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint
Size(mm)  Packaging(PCS/CTN)
Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint
63*50 700
63*56 700
75*50 600
75*56 570
75*63 550
90*50 500
90*56 480
90*63 450
90*75 420
110*50 320
110*56 300
110*63 270
110*75 300
110*90 280
125*75 260
125*90 250
125*110 240
160*75 165
160*90 166
160*110 165
160*125 166
200*90 80
200*110 77
200*125 75
200*160 70
250*110 30
250*125 25
250*160 20
250*200 20
315*160 18
315*200 15
315*250 10

HDPE LAYER SIPHONIC DRAINAGE PIPE FITING MANUFACTURER

WHAT IS SIPHONIC ROOF DRAINAGE AND HOW IT WORKS
Siphonic drainage systems rely on negative pressure to create a vacuum effect and rapidly remove rainwater from rooftops.  In contrast to traditional gravity-based systems, the air does not enter the downpipes, resulting in a higher flow rate, larger volumes of water removed and reduced risks of water accumulation on rooftops.

In addition, siphonic roof drainage systems save space.  Rather than being installed with a slope, the connecting pipes can run parallel to the ceiling, and smaller diameters can be used without sacrificing drainage efficiency.
Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint
Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint

 
Siphonic roof drainage systems are the most effective rainwater discharge technology for flat and low-gradient roofs. Compared to gravity systems, siphonic drainage boasts at least twice higher flow rate, offering better protection from leaks and overflows.
Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint


 
FAQ:

Q1: What about your products and prices?
A: Our products and prices are very competitive in the market, high quality and low price, using 100% new raw materials production.

Q2: What is your warranty policy?
A: YOONYEE  guarantees that the HDPE siphonic drainage pipe fitting will last for 50 years with accurate construction.

Q3: What's your minimum order quantity?
A:  From 10-1000pcs,depending on the products size

Q4: What about delivery time?
A: The common product we always have in stock, it can be shipped within 15 days. And large orders need to negotiate the delivery time, generally not more than 30 days.

Q5: How do I get samples? Free samples?
A: Yes, The samples will be free for 1pc.You can send your full address, telephone number, zip code and so on,the express charge paid by you in advance,when you place the order, we will refund the express charge.

Q6: What are your payment terms?
A: Accept the terms T/T and L/C,Westen union and others.

Q7: How long will it take to receive the quotation?
A: We typically reply to you within 24 hours on working days. Our working time is form 8 a.m. to 5 p.m. (UTC+8).

Q8: Which markets do you mainly export to?
A: Mainly exported to European and American countries, South American markets, Oceania, the Middle East area, Southeast Asia market, and Africa.

Eccentric Reducer HDPE Layer Siphonic Drainage Fittings HDPE Butt Fusion Joint

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier